Document Compliance Report

Audit Ready

Track verification workflows, role-wise checklists, file count compliance and rejection audit history.

Approved & Verified

74

89% compliance rate

Pending Verification

2

Ready for manager sign-off

Pending Upload

7

Below minimum file threshold

Rejected Documents

0

Returned for re-upload

ProjectDocument RequirementCategoryResponsibleFile QuantityStatusRemarks / Action
PRJ-2026-001Site Survey & Rooftop Photos
siteSurveyPhotos
Site SurveySite Engineer3 / 3 min (max 8)APPROVEDVerify
PRJ-2026-001Site Technical Survey & Feasibility Report
siteSurveyFile
Site SurveySite Engineer1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Solar Panels Delivery Challan & Unloading Photos
panelDeliveryFile
Material DeliverySite Engineer2 / 1 min (max 4)APPROVEDVerify
PRJ-2026-001Panel Serial Numbers Sheet & Barcode Scans
panelSerialNumberFile
Material DeliverySite Engineer1 / 1 min (max 6)APPROVEDVerify
PRJ-2026-001Inverter Delivery Challan & Serial Number Photo
inverterDeliveryWithSerailNumber
Material DeliverySite Engineer1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001Electrical BoS Material Delivery Receipt
electricalMaterialDelivery
Material DeliverySite Engineer1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001Fabrication Structure & Civil Material Delivery Challan
fabricationMaterialAndCivelFoundationDelivery
Material DeliverySite Engineer1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001Structure Fabrication DC Delivery Challan
fabricationMaterialDCFile
Material DeliverySite Engineer1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Electrical Material DC Delivery Challan
electricalMaterialDCFile
Material DeliverySite Engineer1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Fabrication Structure Inspection Photos
siteIncpectopnAfterFabrication
Fabrication & Civil WorkSite Engineer2 / 2 min (max 6)APPROVEDVerify
PRJ-2026-001Fabrication Structure Alignment Inspection Report
fabricationInspectionFile
Fabrication & Civil WorkSite Engineer1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001Civil Foundation Work Done Photos
civilFoundationWorkDoneFile
Fabrication & Civil WorkSite Engineer2 / 2 min (max 5)APPROVEDVerify
PRJ-2026-001AC Cabling & Panel Work Done Photos
acWrokDoneFile
Electrical InstallationSite Engineer2 / 2 min (max 5)APPROVEDVerify
PRJ-2026-001DC String Cabling & Array Work Done Photos
dcworkDoneFile
Electrical InstallationSite Engineer2 / 2 min (max 5)APPROVEDVerify
PRJ-2026-001Chemical Earthing Pit Work & Resistance Photos
earthingWOrkDoneFile
Electrical InstallationSite Engineer2 / 2 min (max 5)APPROVEDVerify
PRJ-2026-001Inverter Mounting & Termination Work Done Photos
invertorWorkDoneFile
Electrical InstallationSite Engineer2 / 2 min (max 4)APPROVEDVerify
PRJ-2026-001Electrical Inspection Photos
electricalInspectionFile
Electrical InstallationSite Engineer3 / 3 min (max 6)APPROVEDVerify
PRJ-2026-001Electrical BoS Pre-Commissioning Inspection Report
electricalInspection
Testing & InspectionSite Engineer1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Generation Meter Testing Lab Requisition Letter
genrationMeterTestingLetter
Meter Installation & CommissioningSite Engineer1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001DISCOM Solar Grid Application (A1 Form)
solarApplication
Electricity & DISCOMOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Load Extension Application
loadExtentionApplication
Electricity & DISCOMOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Load Extension Billing Proof & Fee Receipt
loadExtentionSendBillingProff
Electricity & DISCOMOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001DISCOM Solar Sanction Letter
discomSolarSanctionLetter
Electricity & DISCOMOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Solar Loan Application Docket
loanDocumentsForBank
Loan & BankingOperations & Documentation Manager1 / 1 min (max 4)APPROVEDVerify
PRJ-2026-001PM Surya Ghar Portal Registration Acknowledgement
loginToPMSuryaGhar
PM Surya Ghar & SubsidyOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001PM Surya Ghar Subsidy In-Principle Sanction
pmSuyaGharSanctionLetter
PM Surya Ghar & SubsidyOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001DISCOM RTS Scheme Clearance Certificate
rtsFile
Quotation & PaymentsOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Inverter Power-On & Grid Sync Photo
inverterOnFile
Testing & InspectionOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001DISCOM Joint Project Inspection Report (JIR)
projectInspectionFile
Testing & InspectionOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Generation Meter Lab Test Certificate
genrationMeterTesting
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Generation Meter Test Clearance Certificate by MSEB/MSEDCL
genrationMeterByMSEBFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Bi-Directional Net Meter Installation Report
meterInstallationFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 4)APPROVEDVerify
PRJ-2026-001Consumer Meter Replacement & Removal Report
meterReplacementReportFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001DISCOM Net Metering Work Completion & Release Letter
releaseLetterFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001DISCOM Meter Release Order Letter
meterReleaseLetterFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001DISCOM Solar Plant Geo-Tagging Certificate
taggingFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Generation & Net Meter Tagging Photo/Report
meterTaggingFile
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001PM Surya Ghar Joint Field Inspection Report
subsidyInspectionFile
PM Surya Ghar & SubsidyOperations & Documentation Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Subsidy Meter Reading Photograph
subsidyReadingFile
PM Surya Ghar & SubsidyOperations & Documentation Manager1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001PM Surya Ghar Subsidy Claim Redemption Letter
pmSuryaGharRedeemFile
PM Surya Ghar & SubsidyOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Domestic Content Requirement (DCR) Undertaking & Certificate
dcrFile
Project HandoverOperations & Documentation Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001EPC Final Tax Invoice (GST Invoice)
invoiceUrl
Invoice & Final PaymentAdmin1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Online Loan Sanction Letter Approval
onlineApprovalOfSanctionLetter
Loan & BankingOffice Executive1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Customer Aadhaar Card
aadhaar
Customer & KYCAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Customer PAN Card
panCard
Customer & KYCAdmin1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Latest Electricity Bill
lightBillFile
Customer & KYCAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Consumer Light Bill Record
lightBill
Customer & KYCAdmin1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Cancelled Bank Cheque
cancelledCheque
Customer & KYCAdmin1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Bank Passbook Copy
passBookFile
Customer & KYCAdmin1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Signed Purchase Order / Work Order
purchaseOrderFile
Quotation & PaymentsAdmin1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Initial Advance / First Payment Screenshot
firstPaymentScreenshot
Quotation & PaymentsAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Milestone Stage Payment Screenshot
paymentScreenshot
Invoice & Final PaymentAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Final Milestone Payment Clearance Screenshot
finalPaymentScreenshot
Invoice & Final PaymentAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Mounting Structure Stability Inspection Report
structureInspectionFile
Fabrication & Civil WorkAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001DC Side Combiner & Inverter Inspection File
dcSideInspectionFile
Electrical InstallationAdmin1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001AC Distribution Board & LT Panel Inspection File
acInspectionFile
Electrical InstallationAdmin1 / 1 min (max 3)APPROVEDVerify
PRJ-2026-001Civil Foundation & Grouting Inspection Photos
civilFoundationFile
Fabrication & Civil WorkAdmin2 / 2 min (max 6)APPROVEDVerify
PRJ-2026-001Inverter E-Today & Total Generation Display Screenshot
invertorETodayAndTotalGenerationFile
Testing & InspectionAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Earthing Pit Resistance Test & Inspection File
erthingInspectionFile
Electrical InstallationAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Net Meter / Generation Meter Official Inspection Report
meterInspectionFile
Meter Installation & CommissioningAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Customer System Handover & Acceptance Certificate
fileHandOver
Project HandoverProject Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Final Project Handover Print Dossier Ready Slip
handOverFileReadyWithPrintFile
Project HandoverProject Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001Solar Module DCR & Inverter Manufacturer Warranty Pack
handoverDCRWarrantyPack
Project HandoverProject Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2026-001Project Safety Undertaking & Structural Stability Declaration
safetyUndertaking
Project HandoverProject Manager1 / 1 min (max 1)APPROVEDVerify
PRJ-2026-001As-Built Single Line Diagram & Rooftop Layout Drawings
asBuiltDrawings
Project HandoverProject Manager1 / 1 min (max 2)APPROVEDVerify
PRJ-2045Electrical Inspection Photos
electricalInspectionFile
Electrical InstallationSite Engineer2 / 3 min (max 6)PARTIALLY_UPLOADEDVerify
PRJ-2045Customer Aadhaar Card
aadhaar
Customer & KYCAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2045Latest Electricity Bill
lightBillFile
Customer & KYCAdmin1 / 1 min (max 2)APPROVEDVerify
PRJ-2045Site Survey & Rooftop Photos
siteSurveyPhotos
Site SurveySite Engineer3 / 3 min (max 8)APPROVEDVerify
PRJ-2045Solar Panels Delivery Challan & Unloading Photos
panelDeliveryFile
Material DeliverySite Engineer1 / 1 min (max 4)APPROVEDVerify
PRJ-2045Panel Serial Numbers Sheet & Barcode Scans
panelSerialNumberFile
Material DeliverySite Engineer1 / 1 min (max 6)APPROVEDVerify
PRJ-2045Inverter Delivery Challan & Serial Number Photo
inverterDeliveryWithSerailNumber
Material DeliverySite Engineer1 / 1 min (max 3)APPROVEDVerify
PRJ-2045Fabrication Structure Inspection Photos
siteIncpectopnAfterFabrication
Fabrication & Civil WorkSite Engineer2 / 2 min (max 6)APPROVEDVerify
PRJ-2045Civil Foundation & Grouting Inspection Photos
civilFoundationFile
Fabrication & Civil WorkAdmin2 / 2 min (max 6)APPROVEDVerify
PRJ-2045Chemical Earthing Pit Work & Resistance Photos
earthingWOrkDoneFile
Electrical InstallationSite Engineer2 / 2 min (max 5)APPROVEDVerify
PRJ-2045Generation Meter Lab Test Certificate
genrationMeterTesting
Meter Installation & CommissioningOperations & Documentation Manager1 / 1 min (max 1)SUBMITTEDVerify
PRJ-2045Inverter Power-On & Grid Sync Photo
inverterOnFile
Testing & InspectionOperations & Documentation Manager1 / 1 min (max 2)SUBMITTEDVerify
PRJ-2045Bi-Directional Net Meter Installation Report
meterInstallationFile
Meter Installation & CommissioningOperations & Documentation Manager0 / 1 min (max 4)PENDINGVerify
PRJ-2045DISCOM Net Metering Work Completion & Release Letter
releaseLetterFile
Meter Installation & CommissioningOperations & Documentation Manager0 / 1 min (max 1)PENDINGVerify
PRJ-2026-001DISCOM Solar Plant Geo-Tagging Certificate
taggingFile
Meter Installation & CommissioningOperations & Documentation Manager0 / 1 min (max 2)PENDINGVerify
PRJ-2045Customer System Handover & Acceptance Certificate
fileHandOver
Project HandoverProject Manager0 / 1 min (max 1)PENDINGVerify
PRJ-2045EPC Final Tax Invoice (GST Invoice)
invoiceUrl
Invoice & Final PaymentAdmin0 / 1 min (max 1)PENDINGVerify
PRJ-2045Final Milestone Payment Clearance Screenshot
finalPaymentScreenshot
Invoice & Final PaymentAdmin0 / 1 min (max 2)PENDINGVerify