Document Center
101Every file and compliance requirement linked to projects and execution stages.
| Requirement / File | Stage | Project | Assigned / Uploaded By | Date | Status |
|---|---|---|---|---|---|
| south_roof_shadow_profile.jpg | Site Survey & Rooftop Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-03T10:00:00Z | APPROVED |
| parapet_column_measurements.jpg | Site Survey & Rooftop Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-03T10:05:00Z | APPROVED |
| cable_tray_route_feasibility.jpg | Site Survey & Rooftop Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-03T10:10:00Z | APPROVED |
| gaikwad_site_feasibility_report.pdf | Site Technical Survey & Feasibility Report | PRJ-2026-001 | Imran Sheikh | 2026-07-04T14:00:00Z | APPROVED |
| waaree_540w_delivery_challan.pdf | Solar Panels Delivery Challan & Unloading Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-15T11:00:00Z | APPROVED |
| panels_unloading_inspection.jpg | Solar Panels Delivery Challan & Unloading Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-15T11:15:00Z | APPROVED |
| module_barcode_scans_19nos.pdf | Panel Serial Numbers Sheet & Barcode Scans | PRJ-2026-001 | Imran Sheikh | 2026-07-16T14:00:00Z | APPROVED |
| growatt_10kw_serial_number_plate.jpg | Inverter Delivery Challan & Serial Number Photo | PRJ-2026-001 | Imran Sheikh | 2026-07-18T10:30:00Z | APPROVED |
| polycab_dc_ac_cables_receipt.pdf | Electrical BoS Material Delivery Receipt | PRJ-2026-001 | Imran Sheikh | 2026-07-19T11:00:00Z | APPROVED |
| hdg_structure_civil_challan.pdf | Fabrication Structure & Civil Material Delivery Challan | PRJ-2026-001 | Imran Sheikh | 2026-07-20T15:00:00Z | APPROVED |
| fabrication_dc_signed_copy.pdf | Structure Fabrication DC Delivery Challan | PRJ-2026-001 | Imran Sheikh | 2026-07-21T16:00:00Z | APPROVED |
| electrical_dc_challan_verified.pdf | Electrical Material DC Delivery Challan | PRJ-2026-001 | Imran Sheikh | 2026-07-22T11:30:00Z | APPROVED |
| structure_torque_inspection.jpg | Fabrication Structure Inspection Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-25T14:00:00Z | APPROVED |
| structure_tilt_angle_check.jpg | Fabrication Structure Inspection Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-25T14:15:00Z | APPROVED |
| fabrication_alignment_certificate.pdf | Fabrication Structure Alignment Inspection Report | PRJ-2026-001 | Imran Sheikh | 2026-07-26T16:00:00Z | APPROVED |
| foundation_ballast_grouting.jpg | Civil Foundation Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-27T11:00:00Z | APPROVED |
| roof_tar_felt_waterproofing.jpg | Civil Foundation Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-27T11:20:00Z | APPROVED |
| acdb_copper_busbar_termination.jpg | AC Cabling & Panel Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-29T10:00:00Z | APPROVED |
| main_lt_panel_solar_breaker.jpg | AC Cabling & Panel Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-29T10:20:00Z | APPROVED |
| dc_string_dressup_under_modules.jpg | DC String Cabling & Array Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-30T11:00:00Z | APPROVED |
| dcdb_fuse_spd_protection.jpg | DC String Cabling & Array Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-30T11:25:00Z | APPROVED |
| chemical_earthing_pit_ac_dc.jpg | Chemical Earthing Pit Work & Resistance Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-31T15:00:00Z | APPROVED |
| earth_tester_reading_1.2_ohm.jpg | Chemical Earthing Pit Work & Resistance Photos | PRJ-2026-001 | Imran Sheikh | 2026-07-31T15:20:00Z | APPROVED |
| growatt_wall_mount_glands.jpg | Inverter Mounting & Termination Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-08-01T11:00:00Z | APPROVED |
| inverter_ac_dc_termination_view.jpg | Inverter Mounting & Termination Work Done Photos | PRJ-2026-001 | Imran Sheikh | 2026-08-01T11:25:00Z | APPROVED |
| dc_combiner_string_check.jpg | Electrical Inspection Photos | PRJ-2026-001 | Imran Sheikh | 2026-08-02T14:00:00Z | APPROVED |
| acdb_voltage_measurements.jpg | Electrical Inspection Photos | PRJ-2026-001 | Imran Sheikh | 2026-08-02T14:15:00Z | APPROVED |
| insulation_megger_test.jpg | Electrical Inspection Photos | PRJ-2026-001 | Imran Sheikh | 2026-08-02T14:30:00Z | APPROVED |
| bos_pre_commissioning_inspection_sheet.pdf | Electrical BoS Pre-Commissioning Inspection Report | PRJ-2026-001 | Imran Sheikh | 2026-08-03T16:00:00Z | APPROVED |
| meter_testing_requisition_letter.pdf | Generation Meter Testing Lab Requisition Letter | PRJ-2026-001 | Imran Sheikh | 2026-08-04T11:00:00Z | APPROVED |
| msedcl_a1_application_signed.pdf | DISCOM Solar Grid Application (A1 Form) | PRJ-2026-001 | Sunita Sharma | 2026-07-06T10:00:00Z | APPROVED |
| load_enhancement_form_10kw.pdf | Load Extension Application | PRJ-2026-001 | Sunita Sharma | 2026-07-07T14:00:00Z | APPROVED |
| load_enhancement_demand_note_paid.pdf | Load Extension Billing Proof & Fee Receipt | PRJ-2026-001 | Sunita Sharma | 2026-07-08T15:30:00Z | APPROVED |
| msedcl_technical_sanction_order.pdf | DISCOM Solar Sanction Letter | PRJ-2026-001 | Sunita Sharma | 2026-07-10T11:00:00Z | APPROVED |
| sbi_solar_loan_sanction_pack.pdf | Solar Loan Application Docket | PRJ-2026-001 | Sunita Sharma | 2026-07-11T14:30:00Z | APPROVED |
| national_portal_app_ack_10kw.pdf | PM Surya Ghar Portal Registration Acknowledgement | PRJ-2026-001 | Sunita Sharma | 2026-07-12T16:00:00Z | APPROVED |
| pm_surya_ghar_subsidy_sanction.pdf | PM Surya Ghar Subsidy In-Principle Sanction | PRJ-2026-001 | Sunita Sharma | 2026-07-14T10:00:00Z | APPROVED |
| rts_scheme_portal_clearance.pdf | DISCOM RTS Scheme Clearance Certificate | PRJ-2026-001 | Sunita Sharma | 2026-07-15T14:00:00Z | APPROVED |
| inverter_green_led_grid_sync.jpg | Inverter Power-On & Grid Sync Photo | PRJ-2026-001 | Sunita Sharma | 2026-08-05T12:00:00Z | APPROVED |
| discom_joint_inspection_report_jir.pdf | DISCOM Joint Project Inspection Report (JIR) | PRJ-2026-001 | Sunita Sharma | 2026-08-06T15:00:00Z | APPROVED |
| msedcl_meter_test_certificate_pass.pdf | Generation Meter Lab Test Certificate | PRJ-2026-001 | Sunita Sharma | 2026-08-07T16:30:00Z | APPROVED |
| mseb_subdivision_meter_clearance.pdf | Generation Meter Test Clearance Certificate by MSEB/MSEDCL | PRJ-2026-001 | Sunita Sharma | 2026-08-09T11:00:00Z | APPROVED |
| net_meter_installed_sealed_box.jpg | Bi-Directional Net Meter Installation Report | PRJ-2026-001 | Sunita Sharma | 2026-08-11T12:00:00Z | APPROVED |
| old_meter_surrender_final_reading.pdf | Consumer Meter Replacement & Removal Report | PRJ-2026-001 | Sunita Sharma | 2026-08-12T14:30:00Z | APPROVED |
| msedcl_official_release_order.pdf | DISCOM Net Metering Work Completion & Release Letter | PRJ-2026-001 | Sunita Sharma | 2026-08-14T11:00:00Z | APPROVED |
| store_issue_meter_release_note.pdf | DISCOM Meter Release Order Letter | PRJ-2026-001 | Sunita Sharma | 2026-08-15T14:00:00Z | APPROVED |
| discom_geotagging_endorsement.pdf | DISCOM Solar Plant Geo-Tagging Certificate | PRJ-2026-001 | Sunita Sharma | 2026-08-16T16:00:00Z | APPROVED |
| meter_rfid_qr_tag_photo.jpg | Generation & Net Meter Tagging Photo/Report | PRJ-2026-001 | Sunita Sharma | 2026-08-17T17:00:00Z | APPROVED |
| portal_field_inspection_signed.pdf | PM Surya Ghar Joint Field Inspection Report | PRJ-2026-001 | Sunita Sharma | 2026-08-19T11:00:00Z | APPROVED |
| net_meter_reading_display.jpg | Subsidy Meter Reading Photograph | PRJ-2026-001 | Sunita Sharma | 2026-08-20T14:00:00Z | APPROVED |
| subsidy_claim_redemption_ack.pdf | PM Surya Ghar Subsidy Claim Redemption Letter | PRJ-2026-001 | Sunita Sharma | 2026-08-22T10:30:00Z | APPROVED |
| waaree_dcr_manufacturer_certificate.pdf | Domestic Content Requirement (DCR) Undertaking & Certificate | PRJ-2026-001 | Sunita Sharma | 2026-08-23T15:00:00Z | APPROVED |
| sunpoint_final_tax_invoice_inv1040.pdf | EPC Final Tax Invoice (GST Invoice) | PRJ-2026-001 | Sunita Sharma | 2026-08-24T17:00:00Z | APPROVED |
| sbi_online_portal_approval.pdf | Online Loan Sanction Letter Approval | PRJ-2026-001 | Rahul Bhosale | 2026-07-13T11:00:00Z | APPROVED |
| sunil_gaikwad_aadhaar.pdf | Customer Aadhaar Card | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T10:00:00Z | APPROVED |
| sunil_gaikwad_pan.pdf | Customer PAN Card | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T10:15:00Z | APPROVED |
| electricity_bill_june2026.pdf | Latest Electricity Bill | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T10:20:00Z | APPROVED |
| discom_consumer_ledger.pdf | Consumer Light Bill Record | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T10:25:00Z | APPROVED |
| gaikwad_cancelled_cheque.jpg | Cancelled Bank Cheque | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T10:30:00Z | APPROVED |
| sbi_bank_passbook_frontpage.jpg | Bank Passbook Copy | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T10:35:00Z | APPROVED |
| signed_work_order_agreement.pdf | Signed Purchase Order / Work Order | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T11:00:00Z | APPROVED |
| neft_advance_payment_390000.jpg | Initial Advance / First Payment Screenshot | PRJ-2026-001 | Priyanka Iyer | 2026-07-02T11:30:00Z | APPROVED |
| material_delivery_milestone_receipt.jpg | Milestone Stage Payment Screenshot | PRJ-2026-001 | Priyanka Iyer | 2026-07-23T15:00:00Z | APPROVED |
| final_10pct_clearance_receipt.jpg | Final Milestone Payment Clearance Screenshot | PRJ-2026-001 | Priyanka Iyer | 2026-08-26T14:00:00Z | APPROVED |
| structure_stability_audit.pdf | Mounting Structure Stability Inspection Report | PRJ-2026-001 | Priyanka Iyer | 2026-07-28T16:00:00Z | APPROVED |
| dc_side_audit_string_data.pdf | DC Side Combiner & Inverter Inspection File | PRJ-2026-001 | Priyanka Iyer | 2026-08-03T10:00:00Z | APPROVED |
| ac_distribution_safety_audit.pdf | AC Distribution Board & LT Panel Inspection File | PRJ-2026-001 | Priyanka Iyer | 2026-08-03T11:30:00Z | APPROVED |
| civil_anchoring_audit_photo1.jpg | Civil Foundation & Grouting Inspection Photos | PRJ-2026-001 | Priyanka Iyer | 2026-07-28T12:00:00Z | APPROVED |
| civil_anchoring_audit_photo2.jpg | Civil Foundation & Grouting Inspection Photos | PRJ-2026-001 | Priyanka Iyer | 2026-07-28T12:15:00Z | APPROVED |
| inverter_display_etoday_42kwh.jpg | Inverter E-Today & Total Generation Display Screenshot | PRJ-2026-001 | Priyanka Iyer | 2026-08-06T17:00:00Z | APPROVED |
| earth_resistance_calibration_sheet.pdf | Earthing Pit Resistance Test & Inspection File | PRJ-2026-001 | Priyanka Iyer | 2026-08-02T16:00:00Z | APPROVED |
| discom_official_metering_inspection_sheet.pdf | Net Meter / Generation Meter Official Inspection Report | PRJ-2026-001 | Priyanka Iyer | 2026-08-18T14:00:00Z | APPROVED |
| gaikwad_signed_handover_certificate.pdf | Customer System Handover & Acceptance Certificate | PRJ-2026-001 | Ahmed Sheikh | 2026-08-25T11:00:00Z | APPROVED |
| customer_handover_dossier_print_pack.pdf | Final Project Handover Print Dossier Ready Slip | PRJ-2026-001 | Ahmed Sheikh | 2026-08-25T14:00:00Z | APPROVED |
| comprehensive_25yr_warranty_pack.pdf | Solar Module DCR & Inverter Manufacturer Warranty Pack | PRJ-2026-001 | Ahmed Sheikh | 2026-08-25T16:00:00Z | APPROVED |
| epc_structural_safety_undertaking.pdf | Project Safety Undertaking & Structural Stability Declaration | PRJ-2026-001 | Ahmed Sheikh | 2026-08-25T17:00:00Z | APPROVED |
| as_built_sld_and_roof_cad_drawings.pdf | As-Built Single Line Diagram & Rooftop Layout Drawings | PRJ-2026-001 | Ahmed Sheikh | 2026-08-25T18:00:00Z | APPROVED |
| dc_combiner_wiring.jpg | Electrical Inspection Photos | PRJ-2045 | Imran Sheikh | 2026-09-02T10:15:00Z | PARTIALLY_UPLOADED |
| acdb_surge_protector.jpg | Electrical Inspection Photos | PRJ-2045 | Imran Sheikh | 2026-09-02T10:18:00Z | PARTIALLY_UPLOADED |
| ahmed_khan_aadhaar.pdf | Customer Aadhaar Card | PRJ-2045 | Rahul Bhosale | 2026-08-09T11:00:00Z | APPROVED |
| electricity_bill_aug2026.pdf | Latest Electricity Bill | PRJ-2045 | Rahul Bhosale | 2026-08-09T11:05:00Z | APPROVED |
| roof_shadow_south.jpg | Site Survey & Rooftop Photos | PRJ-2045 | Imran Sheikh | 2026-08-12T09:30:00Z | APPROVED |
| parapet_dimensions.jpg | Site Survey & Rooftop Photos | PRJ-2045 | Imran Sheikh | 2026-08-12T09:32:00Z | APPROVED |
| cable_duct_route.jpg | Site Survey & Rooftop Photos | PRJ-2045 | Imran Sheikh | 2026-08-12T09:35:00Z | APPROVED |
| panels_delivery_challan_waaree.pdf | Solar Panels Delivery Challan & Unloading Photos | PRJ-2045 | Imran Sheikh | 2026-08-16T11:00:00Z | APPROVED |
| barcodes_scan_sheet_ahmed.jpg | Panel Serial Numbers Sheet & Barcode Scans | PRJ-2045 | Imran Sheikh | 2026-08-16T14:30:00Z | APPROVED |
| growatt_5kw_serial_plate.jpg | Inverter Delivery Challan & Serial Number Photo | PRJ-2045 | Imran Sheikh | 2026-08-18T10:00:00Z | APPROVED |
| structure_torque_inspection.jpg | Fabrication Structure Inspection Photos | PRJ-2045 | Imran Sheikh | 2026-08-22T11:00:00Z | APPROVED |
| structure_alignment.jpg | Fabrication Structure Inspection Photos | PRJ-2045 | Imran Sheikh | 2026-08-22T11:30:00Z | APPROVED |
| grouting_concrete_cubes.jpg | Civil Foundation & Grouting Inspection Photos | PRJ-2045 | Imran Sheikh | 2026-08-24T14:00:00Z | APPROVED |
| ballast_surface_sealing.jpg | Civil Foundation & Grouting Inspection Photos | PRJ-2045 | Imran Sheikh | 2026-08-24T14:20:00Z | APPROVED |
| earthing_pit_chamber_photos.jpg | Chemical Earthing Pit Work & Resistance Photos | PRJ-2045 | Imran Sheikh | 2026-08-27T10:00:00Z | APPROVED |
| earth_megger_tester_1.4_ohm.jpg | Chemical Earthing Pit Work & Resistance Photos | PRJ-2045 | Imran Sheikh | 2026-08-27T10:30:00Z | APPROVED |
| meter_testing_clearance_certificate.pdf | Generation Meter Lab Test Certificate | PRJ-2045 | Sunita Sharma | 2026-09-03T11:00:00Z | SUBMITTED |
| inverter_sync_led_green.jpg | Inverter Power-On & Grid Sync Photo | PRJ-2045 | Imran Sheikh | 2026-09-03T14:30:00Z | SUBMITTED |
| Bi-Directional Net Meter Installation Report (Pending Upload) | Meter | PRJ-2045 | Operations & Documentation Manager | — | PENDING |
| DISCOM Net Metering Work Completion & Release Letter (Pending Upload) | Meter | PRJ-2045 | Operations & Documentation Manager | — | PENDING |
| DISCOM Solar Plant Geo-Tagging Certificate (Pending Upload) | Meter | PRJ-2026-001 | Operations & Documentation Manager | — | PENDING |
| Customer System Handover & Acceptance Certificate (Pending Upload) | Handover | PRJ-2045 | Project Manager | — | PENDING |
| EPC Final Tax Invoice (GST Invoice) (Pending Upload) | Payment | PRJ-2045 | Admin | — | PENDING |
| Final Milestone Payment Clearance Screenshot (Pending Upload) | Payment | PRJ-2045 | Admin | — | PENDING |