Document Master
71Configure document requirements, min/max file counts, responsible roles, and applicability rules seeded from leadSchema.
Configured rules automatically instantiate project checklists on quotation conversion.
| Document Name & Legacy Key | Category | Stage | Files (Min - Max) | Responsible Role | Applicability | Status | Actions |
|---|---|---|---|---|---|---|---|
Customer Aadhaar Cardkey: aadhaar | Customer & KYC | Documentation | 1 to 2 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
Customer PAN Cardkey: panCard | Customer & KYC | Documentation | 1 to 1 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
Latest Electricity Billkey: lightBillFile | Customer & KYC | Documentation | 1 to 2 filespdf | AdminVerifier: Admin | ALWAYS | Active | |
Consumer Light Bill Recordkey: lightBill | Customer & KYC | Documentation | 1 to 1 filespdf | AdminVerifier: Admin | ALWAYS | Active | |
Cancelled Bank Chequekey: cancelledCheque | Customer & KYC | Documentation | 1 to 1 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
Bank Passbook Copykey: passBookFile | Customer & KYC | Documentation | 1 to 1 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
PR Card (Property Register Card)key: prCard | Property & Ownership | Documentation | 1 to 2 filespdf | Office ExecutiveVerifier: Operations & Documentation Manager | NAME CHANGE REQUIRED | Active | |
Previous Owner Aadhaar Cardkey: previousOwnerAadharCard | Property & Ownership | Documentation | 1 to 2 filesmixed | Office ExecutiveVerifier: Operations & Documentation Manager | NAME CHANGE REQUIRED | Active | |
7/12 Extract (Saat Baara)key: sevenTwelve | Property & Ownership | Documentation | 1 to 2 filespdf | Office ExecutiveVerifier: Operations & Documentation Manager | NAME CHANGE REQUIRED | Active | |
Municipal Property Tax Receiptkey: taxSlip | Property & Ownership | Documentation | 1 to 1 filesmixed | Office ExecutiveVerifier: Operations & Documentation Manager | NAME CHANGE REQUIRED | Active | |
DISCOM Solar Grid Application (A1 Form)key: solarApplication | Electricity & DISCOM | Documentation | 1 to 2 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Load Extension Applicationkey: loadExtentionApplication | Electricity & DISCOM | Documentation | 1 to 2 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Load Extension Billing Proof & Fee Receiptkey: loadExtentionSendBillingProff | Electricity & DISCOM | Documentation | 1 to 2 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
DISCOM Solar Sanction Letterkey: discomSolarSanctionLetter | Electricity & DISCOM | Engineering | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Solar Loan Application Docketkey: loanDocumentsForBank | Loan & Banking | Documentation | 1 to 4 filespdf | Operations & Documentation ManagerVerifier: Project Manager | LOAN REQUIRED | Active | |
Online Loan Sanction Letter Approvalkey: onlineApprovalOfSanctionLetter | Loan & Banking | Documentation | 1 to 1 filespdf | Office ExecutiveVerifier: Operations & Documentation Manager | LOAN REQUIRED | Active | |
Income Tax Returns (ITR)key: ITRFiles | Loan & Banking | Documentation | 1 to 3 filespdf | Office ExecutiveVerifier: Operations & Documentation Manager | LOAN REQUIRED | Active | |
Bank Statements (6 Months)key: bankStatements | Loan & Banking | Documentation | 1 to 2 filespdf | Office ExecutiveVerifier: Operations & Documentation Manager | LOAN REQUIRED | Active | |
PM Surya Ghar Portal Registration Acknowledgementkey: loginToPMSuryaGhar | PM Surya Ghar & Subsidy | Documentation | 1 to 1 filesmixed | Operations & Documentation ManagerVerifier: Admin | SUBSIDY REQUIRED | Active | |
PM Surya Ghar Subsidy In-Principle Sanctionkey: pmSuyaGharSanctionLetter | PM Surya Ghar & Subsidy | Engineering | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Admin | SUBSIDY REQUIRED | Active | |
PM Surya Ghar Joint Field Inspection Reportkey: subsidyInspectionFile | PM Surya Ghar & Subsidy | Subsidy | 1 to 2 filesmixed | Operations & Documentation ManagerVerifier: Admin | SUBSIDY REQUIRED | Active | |
Subsidy Meter Reading Photographkey: subsidyReadingFile | PM Surya Ghar & Subsidy | Subsidy | 1 to 3 filesimage | Operations & Documentation ManagerVerifier: Admin | SUBSIDY REQUIRED | Active | |
PM Surya Ghar Subsidy Claim Redemption Letterkey: pmSuryaGharRedeemFile | PM Surya Ghar & Subsidy | Subsidy | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Admin | SUBSIDY REQUIRED | Active | |
Signed Purchase Order / Work Orderkey: purchaseOrderFile | Quotation & Payments | Converted | 1 to 1 filespdf | AdminVerifier: Admin | ALWAYS | Active | |
Initial Advance / First Payment Screenshotkey: firstPaymentScreenshot | Quotation & Payments | Converted | 1 to 2 filesimage | AdminVerifier: Admin | ALWAYS | Active | |
DISCOM RTS Scheme Clearance Certificatekey: rtsFile | Quotation & Payments | Documentation | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Site Survey & Rooftop Photoskey: siteSurveyPhotos | Site Survey | Engineering | 3 to 8 filesimage | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Site Technical Survey & Feasibility Reportkey: siteSurveyFile | Site Survey | Engineering | 1 to 2 filespdf | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Solar Panels Delivery Challan & Unloading Photoskey: panelDeliveryFile | Material Delivery | Delivery | 1 to 4 filesmixed | Site EngineerVerifier: Operations & Documentation Manager | ALWAYS | Active | |
Panel Serial Numbers Sheet & Barcode Scanskey: panelSerialNumberFile | Material Delivery | Delivery | 1 to 6 filesmixed | Site EngineerVerifier: Operations & Documentation Manager | ALWAYS | Active | |
Inverter Delivery Challan & Serial Number Photokey: inverterDeliveryWithSerailNumber | Material Delivery | Delivery | 1 to 3 filesimage | Site EngineerVerifier: Operations & Documentation Manager | ALWAYS | Active | |
Electrical BoS Material Delivery Receiptkey: electricalMaterialDelivery | Material Delivery | Delivery | 1 to 3 filesmixed | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Fabrication Structure & Civil Material Delivery Challankey: fabricationMaterialAndCivelFoundationDelivery | Material Delivery | Delivery | 1 to 3 filesmixed | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Structure Fabrication DC Delivery Challankey: fabricationMaterialDCFile | Material Delivery | Delivery | 1 to 2 filesmixed | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Electrical Material DC Delivery Challankey: electricalMaterialDCFile | Material Delivery | Delivery | 1 to 2 filesmixed | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Fabrication Structure Inspection Photoskey: siteIncpectopnAfterFabrication | Fabrication & Civil Work | Installation | 2 to 6 filesimage | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Fabrication Structure Alignment Inspection Reportkey: fabricationInspectionFile | Fabrication & Civil Work | Installation | 1 to 3 filespdf | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Civil Foundation & Grouting Inspection Photoskey: civilFoundationFile | Fabrication & Civil Work | Installation | 2 to 6 filesimage | AdminVerifier: Admin | ALWAYS | Active | |
Civil Foundation Work Done Photoskey: civilFoundationWorkDoneFile | Fabrication & Civil Work | Installation | 2 to 5 filesimage | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Mounting Structure Stability Inspection Reportkey: structureInspectionFile | Fabrication & Civil Work | Installation | 1 to 2 filespdf | AdminVerifier: Admin | ALWAYS | Active | |
Electrical Inspection Photoskey: electricalInspectionFile | Electrical Installation | Testing | 3 to 6 filesimage | Site EngineerVerifier: Operations & Documentation Manager | ALWAYS | Active | |
AC Cabling & Panel Work Done Photoskey: acWrokDoneFile | Electrical Installation | Installation | 2 to 5 filesimage | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
DC String Cabling & Array Work Done Photoskey: dcworkDoneFile | Electrical Installation | Installation | 2 to 5 filesimage | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Chemical Earthing Pit Work & Resistance Photoskey: earthingWOrkDoneFile | Electrical Installation | Installation | 2 to 5 filesimage | Site EngineerVerifier: Operations & Documentation Manager | ALWAYS | Active | |
Inverter Mounting & Termination Work Done Photoskey: invertorWorkDoneFile | Electrical Installation | Installation | 2 to 4 filesimage | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
DC Side Combiner & Inverter Inspection Filekey: dcSideInspectionFile | Electrical Installation | Testing | 1 to 3 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
AC Distribution Board & LT Panel Inspection Filekey: acInspectionFile | Electrical Installation | Testing | 1 to 3 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
Earthing Pit Resistance Test & Inspection Filekey: erthingInspectionFile | Electrical Installation | Testing | 1 to 2 filesmixed | AdminVerifier: Admin | ALWAYS | Active | |
Electrical BoS Pre-Commissioning Inspection Reportkey: electricalInspection | Testing & Inspection | Testing | 1 to 2 filespdf | Site EngineerVerifier: Project Manager | ALWAYS | Active | |
Inverter Power-On & Grid Sync Photokey: inverterOnFile | Testing & Inspection | Testing | 1 to 2 filesimage | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Inverter E-Today & Total Generation Display Screenshotkey: invertorETodayAndTotalGenerationFile | Testing & Inspection | Testing | 1 to 2 filesimage | AdminVerifier: Admin | ALWAYS | Active | |
DISCOM Joint Project Inspection Report (JIR)key: projectInspectionFile | Testing & Inspection | Testing | 1 to 2 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Generation Meter Testing Lab Requisition Letterkey: genrationMeterTestingLetter | Meter Installation & Commissioning | Meter | 1 to 1 filespdf | Site EngineerVerifier: Operations & Documentation Manager | ALWAYS | Active | |
Generation Meter Lab Test Certificatekey: genrationMeterTesting | Meter Installation & Commissioning | Meter | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Admin | ALWAYS | Active | |
Generation Meter Test Clearance Certificate by MSEB/MSEDCLkey: genrationMeterByMSEBFile | Meter Installation & Commissioning | Meter | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Bi-Directional Net Meter Installation Reportkey: meterInstallationFile | Meter Installation & Commissioning | Meter | 1 to 4 filesimage | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Consumer Meter Replacement & Removal Reportkey: meterReplacementReportFile | Meter Installation & Commissioning | Meter | 1 to 2 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
DISCOM Net Metering Work Completion & Release Letterkey: releaseLetterFile | Meter Installation & Commissioning | Meter | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
DISCOM Meter Release Order Letterkey: meterReleaseLetterFile | Meter Installation & Commissioning | Meter | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
DISCOM Solar Plant Geo-Tagging Certificatekey: taggingFile | Meter Installation & Commissioning | Meter | 1 to 2 filesmixed | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Generation & Net Meter Tagging Photo/Reportkey: meterTaggingFile | Meter Installation & Commissioning | Meter | 1 to 3 filesimage | Operations & Documentation ManagerVerifier: Project Manager | ALWAYS | Active | |
Net Meter / Generation Meter Official Inspection Reportkey: meterInspectionFile | Meter Installation & Commissioning | Meter | 1 to 2 filespdf | AdminVerifier: Admin | ALWAYS | Active | |
Customer System Handover & Acceptance Certificatekey: fileHandOver | Project Handover | Handover | 1 to 1 filespdf | Project ManagerVerifier: Admin | ALWAYS | Active | |
Domestic Content Requirement (DCR) Undertaking & Certificatekey: dcrFile | Project Handover | Handover | 1 to 1 filespdf | Operations & Documentation ManagerVerifier: Admin | SUBSIDY REQUIRED | Active | |
Final Project Handover Print Dossier Ready Slipkey: handOverFileReadyWithPrintFile | Project Handover | Handover | 1 to 1 filespdf | Project ManagerVerifier: Admin | ALWAYS | Active | |
Solar Module DCR & Inverter Manufacturer Warranty Packkey: handoverDCRWarrantyPack | Project Handover | Handover | 1 to 2 filespdf | Project ManagerVerifier: Admin | ALWAYS | Active | |
Project Safety Undertaking & Structural Stability Declarationkey: safetyUndertaking | Project Handover | Handover | 1 to 1 filespdf | Project ManagerVerifier: Admin | ALWAYS | Active | |
As-Built Single Line Diagram & Rooftop Layout Drawingskey: asBuiltDrawings | Project Handover | Handover | 1 to 2 filespdf | Project ManagerVerifier: Admin | ALWAYS | Active | |
EPC Final Tax Invoice (GST Invoice)key: invoiceUrl | Invoice & Final Payment | Payment | 1 to 1 filespdf | AdminVerifier: Admin | ALWAYS | Active | |
Milestone Stage Payment Screenshotkey: paymentScreenshot | Invoice & Final Payment | Payment | 1 to 2 filesimage | AdminVerifier: Admin | ALWAYS | Active | |
Final Milestone Payment Clearance Screenshotkey: finalPaymentScreenshot | Invoice & Final Payment | Payment | 1 to 2 filesimage | AdminVerifier: Admin | ALWAYS | Active |